Welcome! Please use the navigational links to explore our website.
PartsASAP LogoCompany Logo (800) 853-2651

Shop Now

   Allis Chalmers Case Farmall IH Ford 8N,9N,2N Ford
   Ferguson John Deere Massey Ferguson Minn. Moline Oliver
 
Marketplace
Classified Ads
Photo Ads
Tractor Parts
Salvage

Community
Discussion Forums
Project Journals
Your Stories
Events Calendar
Hauling Schedule

Galleries
Tractor Photos
Implement Photos
Vintage Photos
Help Identify
Parts & Pieces
Stuck & Troubled
Vintage Ads
Community Album
Photo Ad Archives

Research & Info
Articles
Tractor Registry
Tip of the Day
Safety Cartoons
Tractor Values
Serial Numbers
Tune-Up Guide
Paint Codes
List Prices
Production Nbrs
Tune-Up Specs
Torque Values
3-Point Specs
Glossary

Miscellaneous
Tractor Games
Just For Kids
Virtual Show
Museum Guide
Memorial Page
Feedback Form

Yesterday's Tractors Facebook Page

  
Tractor Talk Discussion Board

Re: Another bin question...


[ Expand ] [ View Replies ] [ Add a Reply ] [ Return to Forum ]

Posted by andy r on December 04, 2016 at 18:21:38 from (166.181.82.248):

In Reply to: Another bin question... posted by Dave H (MI) on December 04, 2016 at 09:06:24:

With heavy test weight corn and filling an 18 foot bin well into the cone of the roof you can get close to 5000 bushel. That would be a 7 ring bin (narrow rib bin sheets). I know it shouldn't be filled into the roof, but if the corn is dried outside of the bin to 14% I have never had problems. Cold weather easily penetrates an 18 foot bin freezing the corn. I have taken corn out of the bin in late June and it is still very cold.

I have put four 18' bins up in the last 8 years or so. Doing the concrete yourself probably cuts the bill by 1/2. The concrete delivered from town for the one I did this summer was around $800. Somewhere around 8 yards. The foundation for an 18 foot bin generally is a floating monolithic slab. That means there really isn't a footing, but rather a rat barrier. The slab on top is 6" thick. Under the outside one foot circumference the concrete generally is another foot thick under the top 6" slab. The entire slab/rat barrier is poured at one time. The overall diameter of concrete for an eighteen foot bin generally is around 19 feet allowing for 4", 6", or even 8" extra outside of the first ring. In that outside foot circumference where the concrete is 1 1/2 feet thick generally 2 - 5/8" or 3/4" re-rods are "circled" and located about 2" off of the bottom of the trench. I put little stones under the re-rod to hold it up 2" in the concrete and drive 1/2" re-rod stakes to hold one rod 3" inches from the outside and one rod 3" from the inside. In the top 6" slab I use 1/2" re-rod every 2 feet. One set of re-rod go perpendicular to another set of re-rod - looks like a checker board when you are done. Again these re-rod are all wire tied together and held up in the concrete 1/2 way by placing small stones or broken up concrete chunks under the re-rod. I generally put another re-rod around the top outside edge also - generally one 1/2". I have been putting plastic under the floor concrete to eliminate moisture migration. This is very important when there isn't an air floor, even with a floor I have covered the fill before putting the reinforcement in and pouring the concrete. To hold the bin down to the concrete I have been drilling holes into the concrete and using wedgelock bolts after the bin is built and centered on the foundation. To set up the foundation I drive a 1 1/2" pipe into the ground with exactly 1' sticking out. Tie a heavy cord (mason line) on to it making sure it will rotate around the pipe. I tie another rod or similar marking device to the cord 18' 8" out from the center rod. Walk backwards, keeping the cord tight, while scratching the soil. You can use your screed board to do this rather than the string. Drive 2" by 6" stakes every 18" or so on the outside of this line. Buy some 12" house lap siding (somewhat like Masonite)and attach it to the inside of the 2" by 6" stakes with drywall screws using a drill. To level the 12" lap siding as you attach it, I put a screed board on the center pipe and extend it over the lap siding. A couple big nails into the screed board pointed down into the center pipe helps to hold it. Put a level on top of the screed board. If you are doing this by yourself you can use clamps to temporary hold the lap siding while you adjust it up and down and attach it. After it is all formed up I run a 1/2" cable around the outside of the form. Each end of the cable has connecting points so I can snug it up with a ratchet puller (come along/fence stretcher). There is a lot of pressure and the cable holds everything together well. Then I dig the 1' wide trench around the outside 6" deep. The last thing to do is fill the center with 6" of fill - something like waste lime or gravel fines. Dirt will work if you can get it to settle or pack in a timely fashion. At times I have even formed the inside to hold the center fill with a 6" wide piece of lap siding. When done I generally put 6" of gravel against the concrete leaving 6" exposed. There are a lot of variations when doing the forming with the lap siding. One bin the entire 1 1/2' concrete thickness was above ground with deeper fill inside and then backfilled outside. On farm storage offers greater marketing opportunities. Lastly I wouldn't build a bin without an air floor and at least a 3/4 to 1 hp fan. Good luck.


Replies:




Add a Reply

:
:
:

:

:

:

:

:

:

: If you check this box, email will be sent to you whenever someone replies to this message. Your email address must be entered above to receive notification. This notification will be cancelled automatically after 2 weeks.


 
Advanced Posting Tools
  Upload Photo  Select Gallery Photo  Attach Serial # List 
Return to Post 

TRACTOR PARTS TRACTOR MANUALS
We sell tractor parts!  We have the parts you need to repair your tractor - the right parts. Our low prices and years of research make us your best choice when you need parts. Shop Online Today. [ About Us ]

Home  |  Forums


Today's Featured Article - New Life for an Old Allis - by Tyler Woods. My friend Jon, has an old '39 Allis Chalmers B. He thought it a marginal tractor that had long since served its time. She smoked terribly and never had much power but he couldn't afford another so he was limping along with what he had. Jon's Allis has a small front loader and though it doesn't carry much, it serves his needs. It was the hard starting and low power that made him think it was time to replace the old girl. Jon called me to help him discover why his tractor wouldn't start ... [Read Article]

Latest Ad: Sell 1958 Hi-Altitude Massey Fergerson tractor, original condition. three point hitch pto engine, Runs well, photos available upon request [More Ads]

Copyright © 1997-2024 Yesterday's Tractor Co.

All Rights Reserved. Reproduction of any part of this website, including design and content, without written permission is strictly prohibited. Trade Marks and Trade Names contained and used in this Website are those of others, and are used in this Website in a descriptive sense to refer to the products of others. Use of this Web site constitutes acceptance of our User Agreement and Privacy Policy

TRADEMARK DISCLAIMER: Tradenames and Trademarks referred to within Yesterday's Tractor Co. products and within the Yesterday's Tractor Co. websites are the property of their respective trademark holders. None of these trademark holders are affiliated with Yesterday's Tractor Co., our products, or our website nor are we sponsored by them. John Deere and its logos are the registered trademarks of the John Deere Corporation. Agco, Agco Allis, White, Massey Ferguson and their logos are the registered trademarks of AGCO Corporation. Case, Case-IH, Farmall, International Harvester, New Holland and their logos are registered trademarks of CNH Global N.V.

Yesterday's Tractors - Antique Tractor Headquarters

Website Accessibility Policy