Author 
Larry Hardesty

07-17-2006 07:13:46




Report to Moderator

Plans are moving along on the machine shed. Ground is leveled. I plan a shop area that is 32' x 40' with about 5" cement. What to folks recommend for surface preparation prior to pouring concrete, such as vapor barrior, type and thinkness of gravel or sand, etc. Thanks in advance.




[Log in to Reply]   [No Email]
Animal

07-17-2006 12:10:39




Report to Moderator
 Re: Machine Shed Floor in reply to Larry Hardesty, 07-17-2006 07:13:46  
If it was me doing it again now is the time for plastic tubes for water heat in the floor!



[Log in to Reply]  [No Email]
Midwest redneck

07-17-2006 09:05:53




Report to Moderator
 Re: Machine Shed Floor in reply to Larry Hardesty, 07-17-2006 07:13:46  
I had about 8 inches of fill sand used under the crete and I watered the concrete for a few days the next day after the pour.



[Log in to Reply]  [No Email]
Larry Hardesty

07-17-2006 09:08:46




Report to Moderator
 Re: Machine Shed Floor in reply to Midwest redneck, 07-17-2006 09:05:53  
Thanks, Pretty dry here. Did you do anything special to pack down the soil and sand?



[Log in to Reply]  [No Email]
48C-MAN

07-17-2006 10:53:25




Report to Moderator
 Re: Machine Shed Floor in reply to Larry Hardesty, 07-17-2006 09:08:46  
If you did not do it when the fill was brought in a plate compacter works well.



[Log in to Reply]  [No Email]
48C-MAN

07-17-2006 08:46:20




Report to Moderator
 Re: Machine Shed Floor in reply to Larry Hardesty, 07-17-2006 07:13:46  
If putting down Wirsbo foam and vapor barrier, but if just pouring on top of good gravel or sand base nothing needed. If it is as dry around you as it is here water the soil before you pour or you will lose the mud before you get a chance to trowel it.



[Log in to Reply]  [No Email]
Larry Hardesty

07-17-2006 09:06:07




Report to Moderator
 Re: Machine Shed Floor in reply to 48C-MAN, 07-17-2006 08:46:20  
Yes, pretty dry here in central Nebraska. Thanks



[Log in to Reply]  [No Email]
RustyFarmall

07-17-2006 08:56:34




Report to Moderator
 Re: Machine Shed Floor in reply to 48C-MAN, 07-17-2006 08:46:20  
A heavy plastic vapor barrier will keep the dry soil from sucking the moisture out of the concrete, giving a much longer period for working the concrete and getting the final finish that you want. The contracter that poured my floor insisted on a vapor barrier, and after seeing the finish that was achieved, I wouldn't have wanted it any other way.



[Log in to Reply]  [No Email]
Jimmy King

07-17-2006 12:16:12




Report to Moderator
 Re: Machine Shed Floor in reply to RustyFarmall, 07-17-2006 08:56:34  
Except in a few extream cases that will also keep your floor from sweating.



[Log in to Reply]  [No Email]
Larry Hardesty

07-17-2006 09:05:19




Report to Moderator
 Re: Machine Shed Floor in reply to RustyFarmall, 07-17-2006 08:56:34  
Yes, pretty dry here in central Nebraska. What kind of vapor barrier did your contractor put down...and how thick of gravel or sand base? Did he pack it down with anything? Thanks



[Log in to Reply]  [No Email]
RustyFarmall

07-17-2006 10:44:01




Report to Moderator
 Re: Machine Shed Floor in reply to Larry Hardesty, 07-17-2006 09:05:19  
Not sure how thick the barrier was, maybe 6 mil? I hired a seperate contractor to level the sight, I told him I wanted a good, firm clay base, and I would pay him to haul in the clay if he knew where to find it. He told me that where I lived, he would guarantee that I already had all the clay needed, he would just have to dig a bit to find it. He did have to dig deeper than he originally thought, but he found it, and when he was done with the sight, it was just like a paved highway. In fact, the truck that delivered the building had to drive over the sight so he could unload on the opposite end, and that fully loaded 18 wheeler did not even leave a mark.

[Log in to Reply]  [No Email]
[Options]  [Printer Friendly]  [Posting Help]  [Return to Forum]   [Log in to Reply]

Hop to:


TRACTOR PARTS TRACTOR MANUALS
We sell tractor parts!  We have the parts you need to repair your tractor - the right parts. Our low prices and years of research make us your best choice when you need parts. Shop Online Today. [ About Us ]

Home  |  Forums


Copyright © 1997-2023 Yesterday's Tractor Co.

All Rights Reserved. Reproduction of any part of this website, including design and content, without written permission is strictly prohibited. Trade Marks and Trade Names contained and used in this Website are those of others, and are used in this Website in a descriptive sense to refer to the products of others. Use of this Web site constitutes acceptance of our User Agreement and Privacy Policy

TRADEMARK DISCLAIMER: Tradenames and Trademarks referred to within Yesterday's Tractor Co. products and within the Yesterday's Tractor Co. websites are the property of their respective trademark holders. None of these trademark holders are affiliated with Yesterday's Tractor Co., our products, or our website nor are we sponsored by them. John Deere and its logos are the registered trademarks of the John Deere Corporation. Agco, Agco Allis, White, Massey Ferguson and their logos are the registered trademarks of AGCO Corporation. Case, Case-IH, Farmall, International Harvester, New Holland and their logos are registered trademarks of CNH Global N.V.

Yesterday's Tractors - Antique Tractor Headquarters

Website Accessibility Policy