I"m putting up a pole building to store my tractors.
It will be located about 1/4 mile off a paved road. All that is there now is a crossing with culvert, and a field of wheat. The soil is heavy clay-loam.
I need to build a nearly 1/4 mile driveway through this field to get to my building site. Should I scrape off the top 8" of black dirt and fill with gravel back to level then laser grade ditches, just cover the black dirt with gravel, or do I have to scrape away the black dirt, fill with clay, then cover with gravel? Any cost estimates?
Thanks. Bob seND
It will be located about 1/4 mile off a paved road. All that is there now is a crossing with culvert, and a field of wheat. The soil is heavy clay-loam.
I need to build a nearly 1/4 mile driveway through this field to get to my building site. Should I scrape off the top 8" of black dirt and fill with gravel back to level then laser grade ditches, just cover the black dirt with gravel, or do I have to scrape away the black dirt, fill with clay, then cover with gravel? Any cost estimates?
Thanks. Bob seND